Specifications

© 2011 Segway Inc. All rights reserved. Segway PT Preventive Maintenance Guide
September 2011 22743-00001 ab
11
Recommended Segway PT Maintenance Schedule
Product: Date:
Serial Number: Mileage:
Inspected By: Hours:
Monthly Checks Circle Accordingly
Check LeanSteer installation and torque – 11 N-m Yes No Repaired Replaced
Check tire wear and pressure – i2 = 15 PSI; x2 = 4 PSI Yes No Repaired Replaced
Ensure rider mats are intact, secured, and free of debris Yes No Repaired Replaced
Inspect handle bar grips for proper installation excessive wear Yes No Repaired Replaced
Inspect docking station for condition and functionality Yes No Repaired Replaced
Inspect fenders for cracks and obstructions Yes No Repaired Replaced
Check operation of height adjustment knob Yes No Repaired Replaced
Power on PT. Ensure operability and document hours/miles Yes No Repaired Replaced
Quarterly Checks Circle Accordingly
Check torque of all Fasteners: *Note: Only check with proper torque tool
Perform all monthly checks
Handle bar clamp = 6 N-m Checked Did not check
InfoKey dock = 2 N-m Checked Did not check
Batteries = 1.6 N-m Checked Did not check
Wheel = 30 N-m Checked Did not check
Fascia/Parking stand = 1.5 N-m Checked Did not check
Gearbox Trim = 6 N-m Checked Did not check
Fender = 1.5 N-m Checked Did not check
Perform Function Checks
Check InfoKey operation for proper functionality Checked Did not check
Check InfoKey battery level (see PT Reference Manual) Checked Did not check
Inspect LeanSteer for damage Checked Did not check
Semi-Annually Circle Accordingly
Perform monthly and quarterly checks Yes No
Replace tires and handle bar grips as required Checked Replaced
Test ride PT, note any wheel alignment, drift, or performance issues Yes No
Annually Circle Accordingly
Perform monthly, quarterly, and semi-annual checks Yes No
Dealer to inspect elastomer and coupling as outlined in SB10-001 Yes No
Replace components and update software as necessary, factory
technicians only
Yes No