Test Report

Report Reference No.: 50337286 001
CSA C22.2 No. 107.1
Clause
Requirement Test
Result Remark
Verdict
Page 74 of 75
5.29
When required by clause 4.4.2.7(C), a PCE having a rating of
208V, single phase, and an output receptacle or cord connector
rated 250V shall be marked with the following or equivalent
marking: CAUTION: OUTPUT OF THIS POWER SUPPLY IS
RATED AT 208V AC.
N/A
5.30
A PCE having an internal battery supply shall be marked with
the following or equivalentcaution on the outside of the PCE
unless it is prominrntly visible with any cover or panel opened:
CAUTION: RISK OF ELECTRIC SHOCK. HAZARDOUS LIVE
PARTS INSIDE THESE POWER SUPPLY ARE ENERGIZED
FROM THE BATTERY SUPPLY EVEN WHEN THE INPUT AC
POWER IS DISCONNECTED.
N/A
5.31
When required by clause 4.23.6, the following shall be marked
on the unit or in the accompanying instrcutions:
WARNING:PROVIDE GROUND DETECTION DEVICE
DURING INSTALLATION.
N/A
5.32
The maximum allowable load, in amperes, shall be marked
adjacent to receptacles supplying ac output power if the
allowable load is less than the rating of the receptacle.
N/A
5.33
Where the equipment is liquid filled, the instruction manual shall
include particulars of the dielectric liquid and handling, storage,
and filling instructions.
N/A
5.34-5.46
Where the ……
N/A
5.47
The installation instructions shall include an explanation of any
symbols in the markings on the PCE required by this standard.
6
Tests
P
6.1
Test conditions
P
6.2
Ratings
P
6.3
Tempature(Normal)
P
6.4
Leakage Current
P
6.5
Dielectirc strength
P
6.6
Abnormal operation
P
6.7
Overload(Control Devices)
N/A
6.8
Endurance(Control Devices)
N/A
6.9
Compression(Metal Enclosure)
N/A
6.10
Defection(Metal Enclosure)
N/A
6.11
Flame(Polymeric Enclsure)
N/A
6.12
Resistance to Impact
Metal enclsoure
N/A
6.13
Conduit Connection(Polymeric Enclosure)
N/A
6.14
Flaming Oil(perforated panels)
N/A
6.15
PWB Coating
N/A
6.16
Securement of Components
P
6.17
Strain Relief
P
6.18
Insulating Material
N/A
6.19
Capacitor Discharge(Energy and Shock Hazards)
P
6.20
Tank pressure test
N/A
6.21
Mounting Bracket Vertical Loading test-Liquid filled equipment
N/A
6.22
Mounting means Vertical Loading test-other than Liquid filled
equipment
N/A
7
Industrial dc PCE
N/A
8
PCE for use in recreational vehicles
N/A