Specifications

Basic Rider Optimization Training for the Segway HT Page 87 of 106
Instructor Guide and Participant Workbook Rev 3.5i - January 2004
© Segway LLC 2002 P/N 1707100001aa
Summary
Review these processes in preparation for the Operation and Maintenance Assessment exercise.
> Bring the Segway HT to an open area using Power Assist Mode
> Note the Battery Pack Charge level.
> Check the Control Shaft for tightness/rotation and tighten Control Shaft Clamp bolt if
necessary.
> Check the tire air pressure.
> Perform brief external inspection of Segway HT including:
o Tires
o Wheels
o Battery Packs
o Fenders
o Mat
o Handlebar orientation
> Remove and replace Control Shaft.
> Remove and replace Battery Packs.
> Ride the Segway HT.
> Turn off the Segway HT.
> Plug your Segway HT into AC power
> Confirm that the Segway HT is charging.
> Deploy the Parking Stand (i Series only).
> Unplug your Segway HT and retract the Parking Stand
> Turn on the Segway HT.