User`s manual
ST-174-R2-090294
SEGA Enterprises, Ltd.
(RDJ, 7/18/94)
17
Installing the Main Cover of the Target Box
While referring to the procedure "Removing the Target Box Main Cover," install
the cover by the following steps.
(1) Put the main cover on the frame and tighten the four screws. See Figure 2.2.
(2) Adjust position (height) of the rear ICE/EVA board/SH-2 board plug port cover
so that ICE POD is in a horizontal position. ICE POD will then be secured to the
Target Box. See Figures 2.6 and 2.7.
Figure 2.6 Rear View
With ICE/EVA board/SH-2 board port plus
input bar and POD stay, POD is maintained
in a horizontal position. (This is to ensure
that POD is secure in its place.)
ICE POD Cable