Specifications
Operating Manual SEFRAM 4451
M4451 A00
14
Section 2
Installation
2.1 Introduction
This section contains installation information, power requirements, initial inspection and signal connections
for the SEFRAM 4451.
2.2 Initial Mechanical Inspection
Upon receipt, inspect the instrument for any damage that might have occurred in transit and verify the
contents of the shipment (accessories and installed options).
2.3 Initial Electrical Inspection
The SEFRAM 4451 is calibrated and ready for use when received. The Electrical Performance Check
Procedure is detailed in Section 5.
2.4 Instrument Mounting
The SEFRAM 4451- 50 MHz PROGRAMMABLE PULSE GENERATOR is intended for bench use. The
instrument includes a front feet tilt mechanism for optimum panel viewing angle. The instrument does not
require special cooling when operated within conventional temperature limits.
A 5 cm minimum clearance must be provided at the rear of the unit for proper convection cooling. The unit
can be installed in a closed rack or test station if proper airflow is assured.
2.5 Power Requirements
The SEFRAM 4451 can be operated from any source of 100-240V +/-10% AC, at a frequency from 48Hz to
66Hz. The maximum power consumption is 50 VA.










