User Manual
SEEDHAWK®TOOLBAROPERATOR’SMANUAL39
4.11.9 KNIFELATERALSEPARATION
Confirm knife lateral separation, “Z” 1.5 in(38 mm), FIGURE 19, especially after replacing
knives,toavoidseeddamagewhenapplyinghighratesoffertilizer.
NOTE: As with any field adjustment procedure, make only
onechangetoavariable,operatetheimplementforashort
distance and observe whether the change made any
difference and whether the difference was positive or
negativeinoutcome.
4.12 SUPPLYANDDROPTUBES
4.12.1 BASICCONFIGURATION
Productis delivered to the knife through a supply tube. The supply
tube slides into a formed rubber drop tube, #1 FIGURE 20.The
formed rubber drop tube is attached to the knife by sliding tab, #2
FIGURE20intotheslotontheopenershank.
As the formed rubber drop tube wears, it can be trimmed and
repositioned.Alldrop tubes should be positioned so thetip of the
droptubeis0.5in(13mm)belowthestainlesssteelclip.Alwayscut
droptubeonanangletoallowairtoflowandescape.
z
FIGURE19
FIGURE20
1
2