User guide
SEEDHAWK®30SERIESOPERATOR’SMANUAL77
4.24.7 TRAMLINESETUP
The Tramline function must be enabled to be used. Also, Tramline control valves must be
connectedtothesystemharnessforthemonitortoshowanyoperationfunction.
1.Toenable the tramlineoperation, pressanyof the soft
keys to bring up the sof t key menu. Then press the
“Tramline” button. Press “Enter” again to bring up the
Enable/Disablemenu.
2.Navigate to “Enable” and press “Enter”.Navigate to
“Sprayer Boom Width” and press “Enter”. A drop down
keypad will appear so the user will be able to enter the
widthofthesprayer.
NOTE:The sprayer boom width must be a multiple of the Seeding passwidth. If the Seeding
pass width is 30ft (9m) the sprayer boom width must be 30ft (9m), 60ft (18m), 90ft (27m),
120ft (35.58m) etc.The seeding pass width is the same as the implement width entered in
Globalsettingsandshouldnotneedtobechangedasiscarriesinfromtheglob alsettingentry.
Itcannot beaccessedfromthisscreen.Iftheusermakeschangestothesesettings,cyclethe
poweronthemonitortoresetallthevaluesinthepermanentmemory.
3.“Start First Field Pass” resets the register to pass # 1
when it is set to “YES”. To change
this setting navigate to
this menu choice and press “Enter” then highlight the
choice you want and press “Enter”. This menu selection
should normally be set to “NO” so the pass register does
notresetwhenyouaccessthisscreen.
FIGURE4.96
FIGURE4.95
FIGURE4.94