Specifications

Page9of30
(6) TESTING:
Component Testing: Maximum reliability shall be achieved through extensive use of high-quality,
pre-tested components. Each and every component shall be individually tested by the manufacturer
prior to shipment.
Tools, Testing and Calibration Equipment: The supplier shall provide all tools, testing, and
calibration equipment necessary to ensure reliability and accuracy of the system.
(7) POWER SUPPLY :
230 V + 10 % , 50 Hz + 5% shall be made available for UPS input. Bidder’s scope shall include
complete power distribution for IP CCTV system,Access Control system , Boom Barriers and
Turnstiles, including complete cabling work, DBs and required electrical accessories with suitable
protection devices from UPS (in bidder’s scope) and UPS output to IP CCTV cameras , Access
control devices, Boom Barriers and Turnstiles.