(4) SUBMITTALS: ( IP CCTV, Acess Control System, Boom Barrier and Turnstile)
(i) Drawings:
The system supplier shall submit all shop drawings, and bill of materials for approval
/reference.
Drawings shall be submitted in standard sizes as indicated
Four complete sets (copies) of submittal drawings shall be provided.
Drawings shall be available on CD-ROM.
CCTV, Access Control System, Boom Barrier and Turnstile layout drawing ( A1 size)
Installation drawing for each item ( A3 size )
Bill of Materials ( A4 size)
Cable connectivity drawings and cable schedule. ( A3 Size)
Power distribution scheme ( A3 size)
Specifications and data sheet for each item (A4 size)
List of software and software licenses,(A4 size).
Test certificates, Internal test reports etc.
(ii) System Documentation
System configuration diagrams in simplified block format.
Manufacturer's instructions and drawings for installation, maintenance, and operation of all
purchased items.
Overall system operation and maintenance instructions—including preventive maintenance and
troubleshooting instructions.
A list of all functions available and a sample of function block programming that shall be part of
delivered system.
Shop drawings of card reader stand, canopy/shed as approved by consultant.
Test certificates and internal test reports for each item
Quality Assurance Plan
Operation and maintenance manuals.
(iii) Project Management
The supplier shall provide a detailed project design and installation schedule with time markings and
details for hardware items and software development phases.
Schedule shall show all the target dates for transmission of project information and documents and
shall indicate timing and dates for system installation, debugging, and commissioning.
(5) QUALITY ASSURANCE:
The entire system shall be installed and commissioned from a single vendor to assure reliability
and continued service.
The vendor shall be required to train and instruct client's personnel in the correct use, operation
and supervision of the system, preferably prior to the handing over of the project.
The supplier shall be responsible for inspection and Quality Assurance (QA) for all materials and
workmanship furnished.