Programming instructions
Digital Monitoring Products XR200-485 Programming Guide
vi
REVISIONS
XR200-485 Programming Guide Digital Monitoring Products
1
INTRODUCTION
Introduction
1.1 Before you Begin
This guide provides programming information for the DMP XR200-485/485B Command Processor™ Panel.
After this Introduction, the remaining sections describe the functions of each programming menu item
along with the available options. Before starting to program, we recommend that you read through the
contents of this guide. The information contained here allows you to quickly learn the programming
options and operational capabilities of the XR200-485/485B panel.
In addition to this guide, you should also read and be familiar with the following XR200 and XR200-485/
485B documents:
• XR200 Installation Guide (LT-0197)
• XR200-485/485B Installation Sheet (LT-0362)
• XR200-485/485B Programming Sheet (LT-0358)
• XR200-485/485B Security Command
®
User’s Guide (LT-0364)
Internal Programmer
The panel contains all of its programming information in an on-board processor and does not require an
external programmer. You can perform all programming tasks through a DMP alphanumeric keypad set to
address one.
Programming Information Sheet
Included with each panel are Programming Information Sheets. These list the various programming prompts
and available options for panel programming. Before starting to program, we recommend you completely
ll out each sheet with the programming options you intend to enter into the panel.
Having completed programming sheets available while entering data helps prevent errors and can shorten
the time you spend programming. Completed sheets also provide you with an accurate record of the
panel’s program you can keep on le for future system service or expansion. The remainder of this
Introduction provides instructions for starting and ending a programming session using the alphanumeric
keypad.
1.2 Getting Started
Ground Yourself Before Handling the Panel! Touch any grounded metal, such as the enclosure, before
touching the panel to discharge static.
Remove All Power From the Panel! Remove all AC and Battery power from the panel before installing or
connecting any modules, cards, or wires to the panel.
Before starting to program the XR200-485/485B panel, make sure the panel is properly grounded and AC
and battery power is applied to the appropriate panel terminals. All wiring connections and grounding
instructions are detailed in the XR200 Installation Guide (LT-0197).