Specifications
Defining a Status and an Analog Point
PlantScape Server and Client Configuration Guide 31
c) In the Location field, type the following PLC-5 memory location
I:001/10
7
Click OK to close the Address Builder dialog box and add the address to the
PV Source Address field on the Main tab.
8
Use the mouse to highlight all the contents of the PV Source Address field
and press <Ctrl>+<C> to copy the address.
9
Click the Control tab to display the Control tab, and complete the fields as
follows:
a) Select the Output (OP) Source Address field and press <Ctrl>+<V> (to
paste the address from the clipboard).
b) Select the Output (OP) Destination Address field and press
<Ctrl>+<V>.
c) From the Scan Period drop-down list (for Output (OP)) select 5
seconds.
d) From the Number of Output States drop-down list, select 2.
Figure 3.17 Address Builder Dialog Box
plscpcg.book Page 31 Monday, May 28, 2001 10:11 AM