Specifications

2 – Configuration Overview
10 R400
Configuration Procedures
The table below shows the procedures for configuring the PlantScape server in
their recommended sequence. The table also shows:
Which procedures are part of a basic PlantScape server installation, but are
not mandatory (“Optional Procedure”).
Which procedures relate to licensable options (“PlantScape Option”).
Where to find the information you need to plan and complete the
procedures.
Procedure Tool For Details, See...
Define Station and printer
connection
Quick Builder Configuring Stations and
Printers” on page 57.
Quick Builder online help.
Define Station setup details, and
complete Station and printer
configuration
Station “Configuring Stations and
Printers” on page 57.
Define areas if you are using a
distributed server architecture or
you want to divide your system
into areas.
Station “Dividing the System into
Areas” on page 91
Define controllers and the
communications paths from the
controllers to the server (This step is
not required for PlantScape
Control Processors.)
Quick Builder “Configuring Controllers” on
page 97.
Quick Builder online help.
Test communications between
the server and the controllers
Controller-specific
test utilities
For PlantScape Control
Processors, refer to the
PlantScape Process Software
documentation.
For other controllers, refer to:
“Configuring Controllers” on
page 97.
“Command Reference” on
page 483.
Quick Builder online help.
Table 2.1 Configuration Procedures Checklist
plscpcg.book Page 10 Monday, May 28, 2001 10:11 AM