Installation Guide

3
200478-03
DUAL BRITE
®
ON-TIME
TEST 1 5
1
0 MIN
OFF 3 6
DUSK
TO DAWN
DUAL BRITE
®
ON-TIME
TEST 1 5 10 MIN
OFF 3 6
DUSK
TO DAWN
LIGHT FIXTURE INSTALLATION
For best performance, mount the xture about 8 feet (2.4m)
above the ground.
1. Tighten mounting screws nger tight.
2. Attach mounting bracket to junction box using the two
mounting bracket screws (supplied). Tighten securely.
Mounting Screw
Ground Screw
Bracket Mounting Screws
DISASSEMBLE LIGHT FIXTURE
1. Remove two decorative nuts from light xture cover.
2. Remove cover from base.
3. Remove the two decorative nuts from xture mounting
screws in mounting bracket.
4. Remove the mounting bracket from xture base.
Decorative Nut
Light Fixture Base
Light Fixture Cover
Decorative
Nut
Mounting
Bracket
Junction Box
Mounting Bracket