User Manual

ENFORCER VPD Combiners
6 SECO-LARM U.S.A., Inc.
Installation:
1. Location: Install the unit in a ventilated, dry location where it will not be disturbed by other
activities. A data center room is ideal.
NOTE: For indoor use only. Make sure there is a cool air flow around the unit to prevent it from
overheating.
a. Install the Passive Midpoint VPD Combiners near the power supply at a point between
the cameras and DVR.
b. Install the Active Midpoint VPD Combiners at a point between the cameras and DVR. A
power supply is already included in these models.
c. Install the Passive Endpoint VPD Combiners near the power supply and DVR ideally in
the same room.
d. Install the Active Endpoint VPD Combiners near the DVR ideally in the same room. A
power supply is already included in these models.
2. Mounting:
a. Wall-mounting attach the two included mounting brackets to the sides of the VPD
Combiner (see fig. 1). Then attach to a wall with the four included screws and, if needed,
optional screw anchors.
b. Rack-mounting attach the two included mounting brackets to the front or back of the VPD
Combiner (see fig. 2). Then attach to a standard 19” rack with the four included screws.
NOTE: Rack-mounting is available for 16-channel models only.
Fig. 2 (Rack-Mounting)
Fig. 1 (Wall/Desk-Mounting)