User's Manual

Offline correlation (Multipoint measurement)
70
Step Description
Result: In the displayed menu, up to 8 fields represent the sensors which are
registered in the Correlator's Multi sensor pool.
4
Select the sensors which shall be programmed. Tap the appropriate field to
enable/disable the checkbox.
Only "enabled" sensors will be part of the measurement.
5 Tap the Program and Synchronize button.
6
In the menu displayed, decide whether the measurement shall be carried out
immediately or at night.
Tap one of the two buttons:
Instantaneous measurement
(Explanation:
measurement takes 2min
30sec and starts directly after the
sensors have been deployed)
Custom measurement
(Explanation: Start and end time of the
measurement are set by the user)
7 Use the Time offset field to specify the
period of time which it will take to deploy
the sensors at the individual measuring
points.
The entered time span will later be used
as a "countdown to measurement".
Use the Start of measurement field to
specify when the measurement shall
start.
Use the End of measurement field to
specify when the measurement shall be
finished.
8 Tap the OK button. Tap the OK button.
Result: The sensors are programmed and synchronized successively. The
Correlator successively establishes a connection to each sensor. The progress of
the operation is shown on the screen.
When the operation is completed, a countdown appears on the screen showing
the time remaining before the measurement starts.
Sensor ID
Sensor no.