Service manual

Latest products and information available at www.sealite.com.au
9
AIS Monitoring System
Installation of VHF Antenna
Tools required:
1 x 5mm Allen Key
1 x 10mm spanner or small wrench.
Remove the wing nut from the screw that is holding the antenna base plate in place.
Feed the antenna cable through the hole in the arm and position the antenna.
Secure the antenna using 3 x M6 Countersunk Cap Screws and Nylock nuts.
Remove the protective cap from the antenna plug on the Solar Panel Housing and connect the
antenna. Secure tightly.
Connection of Light, Antenna and GPS Cables
Remove the M8 Socket Head Cap Screws from the corners of the Solar Panel Housing.
With the help of an extra person, lift the SLC600 case off its base. Be careful when laying the
Housing over that you do not damage the Antenna, Lantern or Solar Panel.
Check the cable running from the GPS antenna, AIS antenna and SL125 Lantern are connected
connected to the AIS Telebeacon Case. See Fig 3 for details.
All connections are tested at Sealite before the product is packed.
Note: Do not fit the Solar Panel Housing until the battery is connected. See Battery Connection
section of this manual
Figure 3: Lantern & Antenna Cables