Service manual

Latest products and information available at www.sealite.com.au
10
AIS Monitoring System
Battery Connection
Tools required:
1 x Allen Key, 6mm
2 x 10mm spanners or small adjustable wrenches.
1 x extra person for lifting.
The cover is already removed. (see Connection of light, Antenna and GPS Cables section of this
manual
Unscrew the 4 x Hand-Wheels from the corners of the Battery Box Lid.
Connect the Negative wire to the Negative Battery Terminal. Always connect Negative First!
Connect the Positive wire to the Positive Battery Terminal
Replace the Battery Box Lid and secure with the 4 x Hand-Wheels.
Replace the Solar Panel Housing and secure using the 4 x M8 Socket Head Cap Screws and
Washers.
Testing Lantern Operation
Place a dark towel or jacket over the lantern.
When the lantern detects darkness a Indicator LED on the circuit board will start flashing.
After 30 seconds of continual darkness the lantern will start operating.
For further information please refer to the Sealite SL125 Operator’s Manual.