User Manual
Sealer Sales Page 49
ST-1808-28 Tunnel Service Manual
ELECTRICAL PANEL DIAGRAM
U. Wear rail upper replacement.
1. Disconnect power to machine.
2. Remove drive and idler end caps.
Note: Take out only top half of rollers, then move the open
space to expose upper wear rails. Remove the two bolts
that hold rails in place. Pull our rails and replace with
new rails; reassemble and readjust.
IF UNSURE OF ANYTHING, CONTACT A QUALIFIED
SERVICE TECHNICIAN.
DOUBLE-CHECK ALL OF YOUR WORK BEFORE
STARTING THE MACHINE.