User Manual

Sealer Sales Page 47
ST-1808-28 Tunnel Service Manual
ELECTRICAL PANEL DIAGRAM
R. Wear rails lower adjustments.
1. Disconnect power to machine.
2. Remove idler and drive end caps. Loosen the two bolts
holding each wear rail underneath conveyor, and slide
rails over towards center. There should be 1/16” to a
max. of 1/8” clearance between conveyor chain and
roller. Retighten the two bolts.
S. Wear rails lower replacement.
1. Disconnect power to machine.
2. Remove idler and drive end caps.
3. Remove two bolts underneath conveyor from each wear
rail and slide rails out.
4. Slide new rails in; reassemble and readjust.