User Manual

Sealer Sales Page 41
ST-1808-28 Tunnel Service Manual
MAINTENANCEREPLACE HEATER BANK
O. Heater bank replacement.
(1) Shut off power to machine.
(2) Remove left side safety shield and panel.
(3) Remove access cover and pull insulation out.
Access Cover