User Manual

KS- F S I N S T R U C T I O N M A N U A L
5
Operating your Sealer
Assembly Instructions
1. Insert standing tube (Figure 8, Item #7) into the pedal base (Figure 8, Item #1) and connect
with a screw. Make sure the side with two screw holes is facing upwards.
2. Place sealing head in the tube and screw in place using the two long screws (Figure 8, Item #8-
10, 13).
3. Optional: Connect working plate to body using two working bolts. Affix the working table
using the two remaining working bolts.
4. Plug foot switch in the foot switch receptacle found at the back of the machine.
Operation
1. Before operating, check the heating element, PTFE cover, PTFE adhesive and the
silicone rubber.
2. Insert the power cord into the correct receptacle (110V).
3. Turn the power switch on found on the side of the sealer head.
Figure 2. KS-FS Timer Control Panel
4. The red light above the HEAT button should be on. Use the default settings (lowest setting) and
increase gradually as needed. Thicker bags will need a higher setting.
5. Press the COOL button and adjust settings as necessary. The COOL button determines the
congealing time for the sealing. For a high quality seal, seals must be able to cool under pressure.
We usually recommend a congeal setting of at least 2x that of the heat setting but every bag will
have variations. Thicker materials will require a longer cool (congealing) time.