User Manual

F R M - 1 1 2 0 C I N S T R U C T I O N M A N U A L
55
Quality Control Testing
Our band sealers are manufactured in a facility which is certified in accordance with ISO 9001:2008. In
addition, we quality test all of our band sealers in our facility following a rigorous and exacting standards to
ensure that the product you purchased is a high quality reliable machine.
Steps
Description
Inspect all wiring on the unit, nothing is loosely attached.
Make sure all wires are connected correctly.
Make sure all connections are tight and properly mounted. (Ex: PC Board, Relay)
Check parts to ensure they are in proper working order (ex: wheels, belts, knobs, etc)
CBS-880 only - Attach the conveyor to the body via the drive shaft (Part #40). Detach
after testing.
Turn on machine - start, seal, fan, printer
Check all knobs to make sure they start and end in the correct position
Make adjustments as necessary if there is any unusual noise. Noise should be under
80db.
Check fan - There should be air coming out of the cooling blocks
Check motor - motor brushes should be held in tightly
Check conveyor belt to make sure the belt is running smoothly and evenly
Run machine for at least 20 minutes - after the seal temperature has been reached, seal
bag sample to ensure good quality seal
Band Sealers w/ Printing Option:
Printing - make sure ink heating block, ink printing wheel are at optimal heat
temperature
Sensor and Coding Seat - test the sensor and coding seat are working properly; make
adjustments as necessary
Clean machine
Enter serial # of the unit in the manual
Repackage sealer w/ QC form, sealed bag / printed sample and manual.
Date:
Technician: