User Manual

F R M - 1 1 2 0 C I N S T R U C T I O N M A N U A L
10
Operating your Band Sealer
Operation Set-up
1. Our machines are equipped with a three-prong grounded plug. Make sure the plug is well-
connected in the socket to ensure safe operation.
2. Make sure the circuit breaker is in the ON position. (Levers pointing up)
3. First time operation. Allow the machine to pre-heat by running at a low temperature for a few
minutes. This would apply if the machine has not been in operation for a long time. The
machine can sometimes be damp from storage or shipment and running at a low temperature
will dry out any residual moisture.
4. Adjust the conveyor position forwards or backwards. Loosen the two screws at the bottom of
the conveyor table. Move out the conveyor table to the suitable position, then fasten the screws.
Refer to Figure 6.
Figure 6.
5. Adjust the guide to adjust seal width and position of seal line on your material.