User Manual
F R M - 1 1 2 0 C I N S T R U C T I O N M A N U A L
8
Installation
Important
Read this manual carefully, and make it available to everyone connected with the supervision, maintenance,
or operation of this machine. Additional copies are available at your request. (Contact your distributor for
this information.) Be very careful when operating, adjusting, or servicing this equipment. If in doubt, stop
and obtain qualified help before proceeding.
Installation
Place the band sealer in the desired location with the required electrical power source available. (See power
requirements.) Make certain that proper electrical wiring is provided to guard against low voltage. If the
voltage is too low, the equipment will not function properly.
Finding the proper location is a most important function of the initial set-up. One must take several factors
into consideration:
Adequate power source
Relationship to source of product
Relationship to band sealer
Relationship to any conveyors necessary to transport finished product
Convenience of operator
1. Your new HL-M1120LD band sealer comes packaged in a heavy duty crate to protect it. If your
machine does not arrive in this condition, write on shipping paperwork that outside of box is
damaged. Concealed damage may have occurred.
2. Remove the nails.