Installation Instruction Manual

9
7. Make a 4-1/4 in. (108 mm) diameter hole at the primary
centerline intersection furthest from the wall. Make a 1-1/2 in.
(38 mm) diameter hole at the mark closer to the wall for the
upper rim water line and electrical wires, and at the mark on
the secondary centerline for the lower bowl water supply line
(g.
9
).
8. (9400 series toilet only) Plan ush switch panel location on a
wall so that electrical connections can be made with cables
provided. Be sure panel and wires cannot get wet.
9. (9400 series toilet only) Use Dometic wall switch template to
mark location of fastener and access holes. Drill 1 in. dia. hole,
then fasten panel bracket to wall (g.
10
).
Caution
Preferrably, the discharge oor ange should be installed
directly on the nished oor. However, if the bottom
of oor ange and bottom of ceramic toilet must be
mounted at different heights, the oor ange must be
mounted within 3/8 in. (10 mm) of the bottom of the toilet
(see illustrations below) or leakage may result.
Below-Floor Installation
Above-Floor Installation
10. Insert discharge oor ange into largest hole, orient slots front-to-back, and secure to the oor
with #14 x 1-1/2 in. screws and washers provided. If desired, allow screws to be slightly loose
for front-to-back bowl positioning adjustment. 1/2 in. of front-to-back adjustment is available
(g.
11
).
11. Install sealing grommet into top of discharge oor ange (g.
11
) and lubricate inside diameter
of sealing grommet hole with dishwashing soap.
12. While keeping toilet level, carefully lower toilet to the oor so that toilet discharge outlet inserts
into sealing grommet (g.
12
). Make sure bottom of ceramic toilet sets at on oor.
13. Slide toilet front-to-back until desired bowl location is achieved (near to or against back wall).
Make toilet bowl straight with back wall and mark holes for two mounting bolts (g.
13
).
SeaLand 9300-9400 Series RushFlush Toilets Installation
10
9
11
12
13