Installation Instruction Manual
8
Installation SeaLand 9300-9400 Series RushFlush Toilets
Discharge Plumbing
1. 1/8 in. per foot minimum downhill slope in discharge line is required, keeping all lines as short
and straight as possible.
2. 1-1/2 in. ID pipe or 1-7/8 in. ID hose may be used
• If using 1-1/2 in. pipe:
- Use DWV (drain, waste & vent) pipe ttings that incorporate sweeping changes of direction.
- Do not use schedule 40 or 80 ttings that have tight turns. They will hinder ow of
wastewater to holding tank.
- Install unions as deemed necessary for service.
• If using 1-7/8 in. hose:
- Eliminate hose sags and low spots that may hinder ow of wastewater to holding tank.
3. Check valve (apper style) supplied with every toilet:
• Install this valve as close to toilet as possible, on the discharge
side of the toilet plumbing before the waste line joins with any
common discharge line.
• The valve must be installed with the apper oriented correctly.
- When open, the apper “hinge” must be at the highest pos-
sible location.
- Flapper must open in line with the direction of ow.
- Use caution when gluing valve into place. Make sure excess glue does not contact apper.
4. For ushing overboard through seacock:
• Loop inside toilet must be above waterline.
• Seacock must be 1-1/2 in. full-ow, located no lower than 12 in. below water line.
5.2 Toilet with through-the-floor connections
Note
If replacing an existing center-discharge toilet, make sure the center of the existing
discharge ange is at least 10-1/2 in. (267 mm) from the back wall, then proceed to
Step 5 for proper positioning of water line and electrical wiring access holes.
1. Carefully unpack toilet bowl and oor ange adapter.
2. Position ceramic bowl in the space intended. Conrm that adequate clearance is available for
opening the seat and lid, and, for model 9310, using the ush handle on the left side of toilet.
3. Mark the oor at the rear corners of the toilet bowl. Measure the distance between the two
marks and divide in half to nd the toilet centerline. Mark the oor at the rear wall for the primary
centerline (
5
).
4. Draw a primary centerline on the oor at least 14 in. (356 mm)
long. Mark the center of the oor ange access hole at
10-1/2 in. (267 mm) from the wall (
6
).
5. For the upper rim water supply line and electrical wires access
hole, mark another center spot 6 in. (152 mm) from the back
wall (
7
).
6. At the wall, mark a secondary centerline 3.25 in. (83 mm) to
the left of the primary centerline, and draw the secondary line
about 4 in. (102 mm) long from the wall. Mark the center for
the lower bowl water supply line access hole 2 in. (51 mm)
from the wall (
8
).
5
6
7
8
2 in.
6 in.
3.25 in.
Check valve
Actual model may vary from image being shown.