EN Pressure-assisted toilet Installation manual DE Mazerier-WC Bedienungsanleitung . . . . . . . . . . . . . 13 FR WC dilacérateur Mode d’emploi . . . . . . . . . . . . . . . . . 22 ES Inodoro triturador Manual de instrucciones . . . . . . . . . . 32 NL Toilet met versnijdingspomp Instructihandleiding . . . . . . . . . . . . . . 42 IT WC di macerazione Manuale di istruzioni . . . . . . . . . . . . . 51 FI Silppuripumppu-wc Ohjekirja . . .
SeaLand 9300-9400 Series RushFlush Toilets 1 9300 series 2 9400 series B,C A J D E H I K F M N O L P G 4 3 4 3 2 1 5 B C G A 8 D 9 10 7 6 2 12 11 F E
SeaLand 9300-9400 Series RushFlush Toilets Notes on using the manual Table of contents 1 2 3 4 5 6 1 EN Notes on using the manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 General safety instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 4 Components . . . . . . . . . . . . . . .
General safety instructions SeaLand 9300-9400 Series RushFlush Toilets Caution! Hazard of Flooding If the toilet is connected to ANY through-the-hull fittings, properly installed seacocks MUST be installed in all piping connected to through-the-hull fittings. Seacocks MUST be easily accessible to all users of the toilet or secondary valves fitted in hoses where they are easily accessible. All valves MUST be full bore valves and of marine quality. Screw-to-close gate valves are not recommended.
SeaLand 9300-9400 Series RushFlush Toilets 3 Components Components Basic system diagram* (fig. 2 , page 2) Toilet diagram ( (fig. 3 , page 2) Ref. Description Ref.
Specifications 4.2 SeaLand 9300-9400 Series RushFlush Toilets Approvals • EMC Directive 2004/108/EC • CE compliant components 4.3 Minimum System Requirements Electrical Water Supply Discharge Required components Power draw 1.2 amps @ 12 V DC 0.6 amps @ 24 V DC Circuit breaker/fuse recommended size 2 amps @ 12 V DC 1 amp @ 24 V DC Upper rim 0.5 in. NPT inlet, water valve Lower bowl jet 1 in. NPT inlet, water valve Flow rate 15 gpm/57 lpm @ 30-50 PSI / 207-345 kPa Inside diameter 1.5 in.
SeaLand 9300-9400 Series RushFlush Toilets 5 Installation 5.1 General guidelines Installation For optimum toilet system preformance, follow these guidelines. Make sure to also follow any governing codes or standards that apply to your installation. Fresh Water Supply System Plumbing (fig. 2 , page 2) DO NOT USE RAW WATER SUPPLY 1. All water supply system plumbing should be 1 in. ID, with working pressure ratings above the maximum water pump pressure. (100 PSI minimum recommended). 2.
Installation SeaLand 9300-9400 Series RushFlush Toilets Discharge Plumbing 1. 1/8 in. per foot minimum downhill slope in discharge line is required, keeping all lines as short and straight as possible. 2. 1-1/2 in. ID pipe or 1-7/8 in. ID hose may be used • If using 1-1/2 in. pipe: - Use DWV (drain, waste & vent) pipe fittings that incorporate sweeping changes of direction. - Do not use schedule 40 or 80 fittings that have tight turns. They will hinder flow of wastewater to holding tank.
SeaLand 9300-9400 Series RushFlush Toilets 7. Make a 4-1/4 in. (108 mm) diameter hole at the primary centerline intersection furthest from the wall. Make a 1-1/2 in. (38 mm) diameter hole at the mark closer to the wall for the upper rim water line and electrical wires, and at the mark on the secondary centerline for the lower bowl water supply line (fig. 9 ). 8. (9400 series toilet only) Plan flush switch panel location on a wall so that electrical connections can be made with cables provided.
Installation SeaLand 9300-9400 Series RushFlush Toilets 14. Carefully raise toilet up from floor flange and set aside. Tighten floor flange screws (if loose for adjustment). Drill 3/16 in. pilot holes in the floor for the ceramic toilet mounting bolts. 15. Route 1/2 in. ID upper rim water line through the hole on the primary centerline. Provide 1/2 in. NPT connection for upper rim water line (fig. 14 ). 16. Route 1 in.
SeaLand 9300-9400 Series RushFlush Toilets 5.3 Toilet with through-the-wall connections 1. To install wiring and plumbing connections through the wall, determine the primary centerline location as described in Section 5.2, steps 2 and 3. 2. Mark horizontal primary centerline for plumbing and wiring access holes on wall according to fig. 19 . Mark secondary centerline for lower bowl water line 3 in. (76 mm) to left of primary centerline. Mark hole locations as indicated. 3. Drill two 1-1/2 in.
Customer service 6 SeaLand 9300-9400 Series RushFlush Toilets Customer service There is a strong, worldwide network to assist in servicing and maintaining your sanitation system. For the Authorized Service Center near you, please call from 8:00 a.m. to 5:00 p.m. (ET) Monday through Friday. You may also contact or have your local dealer contact the Parts Distributor nearest you for quick response to your replacement parts needs. They carry a complete inventory for the SeaLand product line.