Installation

11
5.4 Toilet system with through-the-wall
connections
5.5 Toilet/bidet combination
1. To route wiring and plumbing connections
through the wall, use oor template to locate the
vertical centerline of each hole.
2. Place toilet in proper position and mark
horizontal centerlines (g.
20
).
3. Drill holes sizes as indicated on template.
4. Route wiring and plumbing through holes
according to system requirements (Section
4.2). Make sure to provide extra discharge hose
length to assure easy connection to toilet.
5. Follow toilet installation instructions beginning
at Section 5.3, step 12.
1. In Section 5.3, step 3, cut out oblong access hole as
marked on oor template to accommodate two water line
connections and wiring.
2. Route cold water supply line to toilet/bidet mixer valve water
line (with blue band) (g.
21
).
3. Route hot water supply line to bidet faucet hot water line
(with red band).
4. Route wiring and discharge plumbing through holes
according to system requirements (Section 4.2). Make
sure to provide extra discharge hose length to assure easy
connection to toilet.
5. Follow toilet installation instructions beginning at Section
5. 3, step 12.
20
21
SeaLand MasterFlush Toilet Installation