Installation Instruction Manual

10
Dometic 8100 Series MasterFlush ToiletInstallation
5.4 Toilet system with through-the-wall
connections
5.5 Toilet system with “full tank” shut-down relay and
tank monitor system
1. To route wiring and plumbing connections through
the wall, use oor template to locate the vertical
centerline of each hole.
2. Loosen band clamp on discharge loop outlet and
remove straight discharge hose tting (g.
2
5,
p. 2) from discharge adapter tting (g.
2
4, p.
2).
3. Attach discharge elbow tting (g. 1
K, p. 2) to
discharge adapter tting.
4. Place toilet in proper position and mark horizontal
centerlines (g.
17
).
5. Drill holes sizes as indicated on template.
6. Route wiring and plumbing through holes, then follow toilet installation instructions beginning at
Section 5.3, step 10.
Dometic macerator toilets will operate with Dometic’s DTM01C Tank Monitor and DTM04 Four-level
Tank Monitor systems (available separately). In these installations, the 8100 series toilet receives
electrical power through the “full tank” shut-down relay (see Wiring diagrams (pages 11-12.)
1. Route input power wires from “full tank” shut-down relay (previously installed according to tank
monitor system instructions) to 8100 series Flush Switch Panel.
2. Follow toilet installation instructions beginning at Section 5.3, step 10.
17