User manual SkyRaider 35-60cc Camouflage 2.20m Seagull

41
18.
Use a drill and drill bit to drill the holes
for the cowl mounting screws. Make
sure the cowl position is correct before
drilling each hole.
19.
Install the muer onto the engine and
make the cutout in the cowl for muer
clearance. Connect the fuel and pressure
lines to the carburetor, muer and fuel
ler valve. Secure the cowl to fuselage
using the M3x10mm socket head screws.
Putting a small length of silicone fuel
tube under the head of the screw helps
with vibration.
20.
3x10mm.
21.
Loctite.
22.
23.
24.