User manual SkyRaider 35-60cc Camouflage 2.20m Seagull

86’’ A-1 SKYRAIDER 35-60cc WARBIRD
Instruction Manual.
34
4.
Later you with connect the lines from
the tank to the engine and muer. e
vent line will connect to the muer and
the line from the clunk to the carburetor.
Blow through one of the lines to ensure
the fuel lines have not become kinked inside
the fuel tank compartment. Air should ow
through easily.
MOUNTING THE ENGINE
Please study the images be low.
1.
Vent tube.
Fuel pick up tube. Fuel ll tube.
3x15mm.
2.
3.
4.
Install the black simulated exhaust tubes.
6.
5.
Loctite.
Loctite.