User manual PC-9 EP 1.3m Seagull (SEAX-8)

PC9-EP. Instruction Manual.
10
Pushrod install as same as method of
pushrod wing. See pictures below.
PUSHROD INSTALLATION.
NOSE GEAR INSTALLATION.
Adjust the nose gear steering arm until the
arm is parallel with the fire wall.
Install the pushrod wire as shown.
C/A glue.
Elevator control horn.
Pushrod.
C/a glue
Elevator servo.
Rudder
servo.
C/A glue.
Rudder control horn.