User manual SEAGULL ULTIMATE BI-PLANE (90-120) (DELUXE)

www.seagullmodels.com
17
M3 lock nut.
RUDDER PULL - PULL CABLE SYSTEM.
See pictures below:
Rudder
control horn.
ELEVATOR CONTROL HORN
INSTALLATION.
3x30mm.
2 sets.
! 3) Position the rudder horn on the both
side of rudder. The clevis attach- ment holes
should be positioned over the hinge line.
! 4) Using a 1.5mm drill bit and the control
horns as a guide, drill the mounting holes
through the rudder halves.
! 5) Mount the control horns by inserting the
bolts through the control horn bases and
elevator halves, then into the mounting
backplates. Do not overtighten the nuts or the
backplates may crush the wood.
Left side.
Cable.
Right side.
Cable.
Right side.
Elevator control horn.