User guide

Installation & Setup User Guide
revision 143187
backup job is set to start at 1:00 am, then the start time should be 1:30
am.
c. Verify that “1” is selected in the Schedule Task Daily section.
d. Click [OK].
11. In the Schedule Job window, click [OK].
12. Click the Schedule Jobs tab and verify that the calendar is full of scheduled
jobs.
Verify that the Backup (to Tape) is Set Up Correctly
Note: These procedures apply to Dell Precision 340 Workstation platforms with
Microsoft SQL Server 2000.