Specifications
Hardware Description of LCN Node Processors
3.4 Node Processor Related Board Replacement
3/96 Application Module
X
Service 23
Honeywell Inc.
3.4 Node Processor Related Board Replacement
Overview
Node power must be turned off for the purpose of changing circuit boards
in the A
X
M node.
Locating
shutdown
procedure
Software shutdown procedures for the A
X
M coprocessor are documented
in Section 3 of the Application Module
X
System Administration manual.
W
W
A
A
R
R
N
N
I
I
N
N
G
G
Damage can result—
Circuit board damage can result if
you do not practice proper ESD procedures or attempt
to remove/insert a circuit board with node power
applied.
CAUTION
Mandatory steps—
It is mandatory that appropriate
software shutdown procedures are followed for the
A
X
M coprocessor prior to removing power from the
node.
Failure to do so can cause damage to the HP-UX file
structure on the coprocessor hard disk.
ATTENTION
It is also highly recommended that you perform a node
processor software shutdown when preparing to power
off the A
X
M node. This provides for an orderly
departure from the LCN network.










