Specifications
RN: 5-46
RS3: Software Release Notes for P1 R4.2
Changes to RS3 Manuals
DT-2: Procedure 2.7.2, Disk File Restore from Tape
Description: Add statement about the Master License Agreement to
Step 8, as follows:
8
Action:
Response:
Comments:
Cursor to the “Press <ENTER> to Begin” field, and press [ENTER].
The Master License Agreement is displayed. Select <CONFIRM> to continue the
restore operation. While the operation is in progress, this field reads:
Disk Operation in Progress
The operation is complete when the “Press <ENTER> to Begin” field reappears.
The operation takes several minutes to complete.
DT: Chapter 3 (Theory of Operations)
DT-3: Section 2 (Booting)
Description: The bulleted items listed under the second paragraph on
page 3-2-4 were modified to describe the differences in conditions for
the NV Memory card and the Bubble Memory card.
D
For the NV Memory card (1984--1547--000x), the HD5 jumper
must be set to enable the PeerWay boot. For more information
about these jumpers, see SV: 3-7.
D
For the Bubble memory card (1984--1167--000x), the HD19
jumper must be set to enable the PeerWay boot. F or more
information about these jumpers, see SV: 3 -7.
D
For the NV Memory card (1984--1547--000x), the battery jumpers
(HD1 and HD2) must be on.
D
For the NV Memory and Bubble Memory cards, the boot console
must own the device node. Node ownership is configured on the
Plant Status screen; see the Console Configuration Manual
(CC:2).
DT-3: Section 4 (Saving)
Description: The following note was added to page 3-4 -3.
NOTE: When you save Controller information to a Plant Configuration
file on the hard disk, only static data is saved. Dynamic data, including
setpoints, is not saved,
DT: Chapter 4 (Hints)
DT-4: Section 1 (Operation Problems)
Description: Update Tables 4.1.1 and 4.1.2 to reflect current
information. Replace the existing tables with those shown following.










