Specifications
RN: 5-43
RS3: Software Release Notes for P1 R4.2
Changes to RS3 Manuals
Backup Plant Configuration Procedure
Step
Operation Description
1
Action:
Response:
Call up the Backup Plant Config screen by typing:
BUP [ENTER]
The Backup Plant Config screen appears.
2
Action:
Response:
Cursor to the Destination File field; enter the first 5 characters for the destination
file(s) and press [ENTER]. Note that this will overwrite an existing file that has the
same name.
The initial destination filename will be displayed.
3
Action:
Response:
Cursor to the Max Rev Letter field; enter a letter from A through Z, representing the
number of revision levels you want to store, and press [ENTER].
The maximum revision letter will be displayed.
4
Action:
Response:
Cursor to the node fields and press [ENTER] on each node number you want to
back up.
An asterisk will appear for each node selected.
5
Action:
Response:
Cursor to the Write Backup File to Disk field and press [ENTER].
This backup configuration is saved to disk with the filename $$BACKUP, in the
Plant Config folder .
6
Action:
Response:
Call up the Console Configuration screen by typing CCC [ENTER].
The Console Configuration screen (first page) appears.
7
Action:
Response:
Go to the second page of the Console Configuration screen by pressing [PAGE].
Second page of Console Configuration screen appears.
8
Action:
Response:
Cursor to the Plant Config field and press [ENTER].
“Enable” appears in the Plant Config field.
9
Action:
Response:
Cursor to the Plant Config Event Type field, enter an event type from 0–240, and
press [ENTER].
The event type appears in the Event T ype field.
10
Action:
Response:
Set up a corresponding event to trigger the automatic plant configuration backup
operation.
Next time this event occurs, it will trigger an automatic plant configuration backup.










