Specifications

RN: 5-36
RS3: Software Release Notes for P1 R4.2
Changes to RS3 Manuals
ControlFile
Disk Load Program
or Script
$$AFIC
FIC
FIC
Plant Program
Figure 2.3.2A. Loading the $$AFIC Plant Program File
To load a FIC/FIM program image to an FIC/FIM, the console you are at
must own the ControlFile node on which the FICs or FIMs are located.
-
To call up the Plant Status screen to check node ownership,
type:
PS [ENTER]
Owned nodes are backlighted. F or information about changing the node
ownership, see CC: 2. For more information on FIC/FIM addressing,
see OV: 4.
NOTE: Some FICs/FIMs require that a FIC/FIM program resides on the
card in order to operate. For these F ICs/FIMs, you must load the
program software to the F IC/FIM in the following situations:
D
Upon initial ca rd installation
D
Whenever the software program is changed
D
When a different image is to be supported
Figure 2.3.3 shows a sample Disk Activity screen that loads the FIC
image file to FICs =30AD1 through =30AD8 residing at Controller
Processor =30AD.
Perform Procedure 2.3.4 to load F IC/FIM program image files.