Installation & Assembly

Page 3 of 3
INSTALLATION INSTRUCTIONS
SLR2 SEATS
17" - 19"
FROM
TOP OF SEAT
TO FLOOR
SEAT SHOWN
IN DOWN
POSITION
SIDE VIEW
Level the seat by changing the adjustable
rubber feet to the desired mounting height
(17”-19”). Tighten the lock nuts.
With the mounting flanges placed flush
against the wall, mark the position of the
three holes in each flange. Using a 1/8”
Carbide tip drill bit (not provided), create
three mounting holes each for the right and
left mounting flanges.
Use clear silicone sealer at each hole location to prevent water damage to existing structures as desired.
4. Mounting the seat to the wall.
Holding the seat assembly in the down position, make any necessary final adjustments to the
adjustable rubber feet. With the feet resting firmly on the floor, tightly secure the two mounting
flanges to the wall AND INTO 2” THICK, SOLID WOOD IN-WALL BACKING MATERIAL, using six (6)
#12 x 2-1/2” stainless steel screws (supplied by manufacturer). Tighten screws completely AFTER all
screws are in place.
5. Check Seat for:
1) Proper up and down operation.
2) Correct finished height.
3) Correct distance from wall.
4) Weight bearing.
THIS COMPLETES THE INSTALLATION OF THE SLR2 SHOWER SEAT
Hardware provided:
(4) ¼”-20 X 2” Phillips Flat Head machine screws
(4) ¼”-20 Nylon Lock Nuts
(6) #12 X 2-1/2” Phillips Pan Head sheet metal screws
Tools required:
Tape measure, masking tape, power drill, 1/8” Carbide tip drill bit, marking pen/pencil, level, #3 phillips driver.