User's Manual
Screen Service SDT 200UB – SDT 500UB ARK-1 ATSC Operations
July, 2009 v 1.0 Page 3 - 4
3.1 INSTALLATION
3.1.1 INSTALLATION PROCEDURE CHECK OFF
Some procedures in this section contain steps preceded by a check box. Fill out or initial each step as it is
completed.
3.1.2 SITE SELECTION
Use the following specifications to establish criteria for site selection and equipment installation.
3.1.2.1 MOUNTING SPECIFICATIONS
¾ Mount.
• A floor-standing, open rack or permanent structure with vertical mounting members conforming to
EIA Standard 310 is recommended.
¾ Environment.
• Ambient temperature: 0°C to +45°C (room temperature or below is ideal)
• Relative humidity: 10% to 90%, non condensing
¾ Clearance.
• No clearance is required for sides.
• At least 1 U free space above and below the equipment is recommended to obtain adequate cooling.
• Access to the front requires approximately 20 centimeters clearance for making connections.
• Access to the rear requires approximately 20 centimeters clearance for making connections.
3.1.3 UNPACKING
The containers used to ship a MAGNUM transmitter will vary with the number of options ordered. If there is
any external damage to the containers, inform the shipping company and request that an agent be present
during unpacking. Carefully unpack the boxes (no special instructions are required) and note any damage
making pictures if possible.
After all items are unpacked, check the equipment received. If there are any damages or shortages, notify
the carrier and Screen Service BT immediately.