Installation and Manual
Table Of Contents
- Table of Contents
- Installation: Product Specifications Page 2
- Model Number Description Page 3
- Water Page 4
- CU1526 and CU2026 Cabinet Layout Page 5
- CU3030 Cabinet Layout Page 6
- Ice Storage Bin Removal Page 7
- Plumbing Requirements Page 8
- Electrical Page 9
- Final Check List Page 9
- Initial Start Up Page 10
- Adjustments Page 11
- Use and Operation Page 12
- Control Switches Page 13
- Cleaning, Sanitation and Maintenance Page 14
- What to do before calling for service Page 16
Electrical
The machine is supplied with a power cord.
208-230 volt, 60 Hz cords have NEMA 6-20P
plugs.
This is a cord-connected unit, and must be on a
separate power supply. Check the dataplate for the
voltage, ampacity and maximum fuse size and per
the dataplate use fuses or HACR circuit breakers.
Follow All Local Codes - This Unit Must Be
Grounded. Do not use extension cords and do not
disable or by-pass ground prong on electrical plug.
Final Check List
After connections,
1. Wash out the bin. If desired, the interior of the
bin could be sanitized.
2. Locate the ice scoop (if supplied) and have it
available for use when needed.
Final Check List:
1. Is the unit located indoors in a controlled
environment?
2. Is the unit located where it can receive
adequate cooling air?
3. Has the correct electrical power been supplied
to the machine?
4. Have all the water supply connections been
made?
5. Have all the drain connections been made?
6. Has the unit been leveled?
7. Have all unpacking materials and tape been
removed?
8. Is the water pressure adequate?
9. Have the drain connections been checked for
leaks?
10. Has the bin interior been wiped clean or
sanitized?
11. Have any water filter cartridges been replaced?
12. Have all required kits and adapters been
properly installed?
May 2008
Page 9
CU1526, CU2026, CU3030
User Manual