Unit installation

2008 SCION xB BATTERY RELOCATION
Procedure
Issue A: 04/28/08 Page 39 of 48
19. Battery Relocation-Installation
(a) Loosely install the supplied TRD battery ground
cable relocation bracket to the vehicle using the
O.E. fastener (Fig. 19-1)
(
b) Install the supplied battery hold-down stud with
washer and jam nut through the ground cable
relocation bracket and into the air inlet bracket.
Tighten the jam nut and O.E. fastener at this
time. Torque O.E. fastener to 80 in-lbs. (Fig.
19-1)
(c) Using the 6mm flange-head screw provided,
secure the O.E. ground cable to the relocation
bracket. Torque fastener to 80 in-lbs. (Fig. 19-
1)
(d) Install the supplied plastic battery tray spacer.
(Fig. 19-2)
(e) Reinstall the battery plastic tray, battery, and
battery cover, and secure it with the TRD
supplied battery tie down bracket and hardware.
Torque fastener to 80 in-lbs.
NOTE: Be sure to locate battery in battery
t
ray all the way forward AND all the way
toward the driver side of the tray to allow
maximum supercharger clearance. (Fig. 19-3)