Unit installation
2008 SCION xB OIL FEED CONNECTION
Procedure
Issue A: 04/28/08 Page 29 of 48
16. Oil Feed Line & A/C Harness.
(a) Attach open end of the previously installed
TRD Oil Feed Line to supercharger fitting.
Leave hand tight for now. (See Fig 16-1.) Do
not use Teflon paste on flared fittings. The
feed tube should route between heater hoses.
(b) Adjust (rotate 90 degrees) the water line clamp
as needed so that it does not interfere with Oil
Feed Line.
(c) Now carefully tighten both ends of the Oil Feed
Line (9/16” wrench) and recheck for clearance
around line. Loosen and re-clock as needed
until line is clear and then re-tighten into place.
(Fig. 16-2). D
o not over-tighten flared
fittings!
(d) Reconnect Alternator and Crank Position Sensor
wires.
(e) Add wire clamp to alternator-a/c harness at the
supercharger front bearing bracket. Re-use O.E.
6mm bolt removed from alternator in previous
step to fasten clamp to cast aluminum SC
bracket. Use 2 small TRD-provided zip ties to
secure CPS wire to wire loom. Keep wires and
wire connectors strain-free and away from the
exhaust manifold heat and drive pulley as much
as possible. Torque to 80 in-lbs (See Fig. 16-
3
)
9/16”
9/16”
Fig. 16
-
2
Fig. 16
-
1
Fig. 16
-
3










