Unit installation
2008 SCION xB STARTER INSTALLATION
Procedure
Issue A: 04/28/08 Page 28 of 48
(h) Route the wiring loom and automatic
transmission breather hose (if applicable) before
and/or during starter motor installation. (See
Fig. 15-4). NOTE: Supercharger is removed in
photo for clarity.
(i) Reinstall starter motor and starter motor wires.
Tighten starter motor mounting bolts. 14 mm
wrench. Torque to 27 ft-lbs (Fig. 15-5)
N
OTE: Ensure that no wires or hoses are
pinched and remain strain-free.
(j) Re-connect Starter Connector wire plug and
main Starter Wire. (12 mm wrench.) Torque
to 7 ft-lbs. (Fig. 15-5)
Fig. 15
-
4
12 mm
Fig. 15
-
5
14 mm










