Setup guide

3
Validation Thermocouple Calibration:
11. New! Turn the machine off and back on, while keeping Unwrapped and Wrapped
button pressed to go back to Service Mode. Enter password to continue. Toggle
using keypad through the menu selection to reach Calibration option and press R&P
key. The display should show the calibration screen.
12. Check that there is sufficient water in the water reservoir before proceeding.
13. Start a Validation Assy. self-calibration cycle. To do this, press and hold the
UNWRAPPED button and in the same time press START button. The character “
will appear immediately to the right of the Validation thermocouple hexadecimal
offset on the display to indicate that a Validation Assy. calibration cycle is running.
This calibration will take approximately 6 minutes.
14. Allow the Validation Assy. self-calibration to complete. The temperature within the
chamber will rise to the sterilization temperature. Wait until sterilization phase of the
calibration cycle ends automatically. The offset value in the upper left-hand corner
of the display (CVO) may have changed to a new offset value.
15. Press the STOP button to end the Validation TC self-calibration cycle.
16. Power off the Statim.
Backup NVRAM:
17. It is recommended to Backup calibration data on completion of the Calibration
process. This data will automatically be reloaded to NVRAM in case the calibration
data is lost due to a power surge or other reason.
18. Power up unit in Service Mode (same as at 11 above) and scroll through the options
available using Unwrapped/ Wrapped key until Backup NVRAM option is on the first
line of the display. Select this option by pressing R&P key. Using Unwrapped key
change the NVRAM mode to ON and press R&P key to backup the NVRAM. The
display will show the backup progress in 0%, 50% and 100% percent. On completion
of this operation press STOP key to exit the Service Mode.
Calibration of the Statim autoclave thermocouples is now complete.