Installation Guide

Page 16
7. Installation
Fan level indicator
Fan On/Off Fan Level
Reduction
Fan Level
Increase
Timer Lam On/Offp
D
E
A
B
C
D
E
D
E
D
E
Electric Gas
Drill the D, E points with a Ø 6mm drill bit to screw the ue
installation plate referring to the min. and max. heights of
the appliance.
Install 6 mm dowels to the holes you have drilled.
Fan level indicator
Fan On/Off Fan Level
Reduction
Fan Level
Increase
Timer Lam On/Offp
D
E
A
B
C
D
E
D
E
D
E
Electric Gas
Tightening the suspension screws
Tighten 5.5x60 suspension screws to Ø10 mm dowels (A,
B) you have tapped on the wall. The distance between
screw head and the wall will be 5 mm.
Fan level indicator
Fan On/Off Fan Level
Reduction
Fan Level
Increase
Timer Lam On/Offp
D
E
A
B
C
D
E
D
E
D
E
Electric Gas
Tighten the ue installation plate to the Ø 6 dowels you
have tapped to the wall using the 3.9x22 screw supplied
with your hood.
Fan level indicator
Fan On/Off Fan Level
Reduction
Fan Level
Increase
Timer Lam On/Offp
D
E
A
B
C
D
E
D
E
D
E
Electric Gas
Suspending the Hood to the Wall:
Hold the hood from its body and suspend it to the wall on
A and B points using the (L) plates you have xed on the
hood cabinet before.
Fan level indicator
Fan On/Off Fan Level
Reduction
Fan Level
Increase
Timer Lam On/Offp
D
E
A
B
C
D
E
D
E
D
E
Electric Gas
When the suspension procedure is completed, tighten the
suspension screws installed to the wall with a screwdriver
to prevent moving of the appliance.