Owner`s manual
GP-MSJW-CX-07B
STW-JZ / IW Manual
RD: Sept, 2005
RL: 7B
KH
TABLE 4 TURBULATORS
MODEL
TURBULATOR
LENGTH
(IF REQUIRED)
STW-JZ / IW-200-70/60/50 10’
STW-JZ / IW-175-70/60/50 10’
STW-JZ / IW-155-60 not required
STW-JZ / IW-155-50 not required
STW-JZ / IW-155-40 10’
STW-JZ / IW-130-50 not required
STW-JZ / IW-130-40 10’
STW-JZ / IW-130-30 14’
STW-JZ / IW-110-50 not required
MODEL
TURBULATOR
LENGTH
(IF REQUIRED)
STW-JZ / IW-110-40 10’
STW-JZ / IW-110-30 14’
STW-JZ / IW-80-40 10’
STW-JZ / IW-80-30 14’
STW-JZ / IW-80-20 14’
STW-JZ / IW-60-30 14’
STW-JZ / IW-60-20 14’
STW-JZ / IW-45-20 5’
STW-JZ / IW-45-10 5’
Where required the STW-JZ Series Heaters will be supplied with the turbulators
factory installed into the end tube(s) of the system configuration, and the tubes
marked for easy identification on site.
NOTE:
1. Tube
2. Tube Coupler
3. Swaged section of tube
4. Point at which the Swaged tube slides into
other section of tube
5. Line of the joint
FIGURE 11 COUPLER
Once the two tubes are joined together,
place the centre of the Coupling over the
line of the joint and torque to 40ft/lbs.
5
4
3
2
1
Page 12