Installation Guide
2
Copyright © 2014 Schneider Electric. All Rights Reserved.
All trademarks are owned by Schneider Electric Industries SAS or its affiliated companies.
www.schneider-electric.com
Conext XW+ Connection Kit for INV2 INV3 PDP Installation Guide
865-1020-02
C
Knockout Dimensions
Back Knockouts
Bottom Knockouts
Inner: 3/4" Trade (PG 21)
Outer: 1" Trade
Inner: ISO-16
Outer: 1/2" Trade (PG 16)
Inner: ISO-40
Outer: ISO-50
Inner: 1 1/2" Trade
Outer: 2" Trade
EQUIPMENT DAMAGE
Do not drill, cut or punch holes into the Conduit Box, XW+ chassis, or Power Distribution
Panel. Use only the knockouts provided for conduit entry.
Failure to follow these instructions can result in damage to equipment.
NOTICE
Inner: 2" Trade (62.7 mm)
Outer: 2 1/2" Trade (75.6 mm)
Inner: (22.2 mm or PG21)
Outer: (28.2 mm)
Inner: 3/4" trade (28.2 mm or PG21)
Outer: 1" trade (35.0 mm)
Inner: 2" trade (62.7 mm)
Outer: 3" trade (90.0 mm)
Inner: 1/2" trade (22.2 mm or PG16)
Outer: 3/4" trade (28.0 mm)
Inner: 1/2" trade (22.2 mm or PG16)
Outer: 3/4" trade (28.0 mm)
Remove interior screw to
remove left or right
sideplate
Side Knockouts
Horizontal raceway
for routing Xanbus,
AC Sync, Aux, and
BTS cabling between
inverters or outside
the unit
V-raceway for routing
Xanbus, AC Sync,
Aux, and BTS cabling
to data ports on the
bottom of the inverter
D
Wall Mounting the Conduit Box
Remove the Conduit Box front panel, the left or right sideplate and the
raceway knockout
Secure the Conduit Box to the wall
Using two screws suitable for the type of wall material (not provided), secure the
bracket at the bottom edge of the rear panel to the wall.
Secure the Conduit Box to the Conext XW+
Either sideplate can be removed depending on the location of the adjacent PDP and
Conext XW+. If the Conduit Box is located between two XW+ units, then remove both
sideplates and knockouts.
Wall Mounting Considerations
• If conduit is routed from the floor, remove the bottom panel of the Conduit Box before
wiring. Remove the appropriate knockouts and re-attach the bottom panel to proceed
with conduit installation and wiring.
• If conduit is routed through the wall on which the XW+ unit and PDP are mounted,
remove the appropriate knockouts on the back panel of the Conduit Box.
• Use plastic cable ties for cable management inside the Conduit Box.
Remove sideplate and
raceway knockout
IMPORTANT: Before installing the Conduit Box, wall mount the Conext XW+.
For detailed mounting instructions, see the Conext XW+ Inverter/Charger Installation
Guide.
1
Wall mount the Conext XW+
1. Align the keyhole slots on the top edge of the Conduit Box with the corresponding
screws on the bottom of the inverter. Loosen the screws if necessary.
2. Hang the Conduit Box on the XW+ unit by fitting the keyholes to the screws and
pushing towards the wall until snug.
When removing your choice of knockouts, ensure no debris remains inside the chassis.
Insert appropriately sized conduit bushings.
Secure the bracket with wall screws (not provided)