User manual
Chapter 3 Specifications
3-3
Structural Specifications
Installation
Grounding
Grounding resistance of 100Ω 2mm
2
or thicker wire,
or your country’s applicable standard.
(Same for FG and SG terminals)
Structure
*1
*1. The front face of the OT unit, installed in a solid panel, has been tested using conditions
equivalent to the standards shown in the specification. Even though the OT unit’s level of
resistance is equivalent to these standards, oils that should have no effect on the OT can
possibly harm the unit. This can occur in areas where either vaporized oils are present, or
where low viscosity cutting oils are allowed to adhere to the unit for long periods of time. If
the OT’s front face protection sheet is peeled off, these conditions can lead to the ingress of
oil into the OT and separate protection measures are suggested.
Also, if non-approved oils are present, they may cause deformation or corrosion of the front
panel’s plastic cover. Therefore, prior to installing the OT be sure to confirm the type of
conditions that will be present in the OT’s operating environment.
If the installation gasket is used for a long period of time, or if the unit and gasket are
removed from the panel, the original level of the protection can be compromised. To
maintain the original protection level, be sure to replace the installation gasket regularly.
Rating: Equivalent to IP65f NEMA #250 TYPE 4X/13
(Front surface at panel embedding)
Feature size: All-in-one
Installation configuration: Panel embedding
Cooling Method Natural air circulation
Weight Approx. 1.0kg[2.2lb]max. (unit only)
External
Dimensions
W167.5mm[6.59in] X H135mm[5.31in] X D59.5mm[2.34in]
Panel Cut
Dimensions
W156.0mm[6.14in] X H123.5mm[4.86in]
*2
Panel thickness: 1.6mm[0.06in] to 5.0mm[0.20in]
*2. As for dimensional tolerance, ensure everything is +1/-0mm[+0.04/-0in] and R in angles are
below R3[0.12].