Quick start manual
Premium and Advantys STB on Profibus DP.doc – Juni-05
Schneider Electric
38
Downloading
a program
1
Upon completion of
programming, the entire
project must be built. To do
this, select the relevant menu
item or button.
2
You must define the PLC
address before establishing a
connection with the PLC.
Depending on the connection
used, you can select
UNTLW01 for a Uni-Telway
connection or USB for a USB
connection. In both cases, the
PLC SYS address (standard
system address) should be
used.
3
The connection is made using
the "Connect" menu item from
the "PLC" menu, or the
equivalent button. The
programming cable (serial or
USB) must be connected to
the PLC.
4
Transfer the application
program to the PLC and then
start the PLC.
Note: If you want the PLC to
start as soon as the download
is complete, you must check
the relevant box before
starting the transfer.